Before & after

Real jobs photographed at the groundwork stage and again once the concrete was finished: barns, yards, drives, aprons and car parks.

Drag or tap the slider on each photo to compare the groundwork stage with the finished concrete.

Before: DPM and steel mesh on spacers across a barn floor After: finished power-floated barn floor BeforeAfter

Barn floor, new steel frame

Membrane and reinforcement fixed on spacers, then poured and power floated wall to wall.

Before: car park extension with membrane, mesh and day-joint formwork After: finished tamped concrete car park extension BeforeAfter

Commercial car park extension

Kerbed, meshed and poured in bays, finished with a tamped surface for grip.

Before: excavated drive and track around a farmhouse, seen from above After: finished concrete drive and trackway curving around the farmhouse BeforeAfter

Farmhouse drive & trackway

Dug out, sub-base laid and shuttered, then poured as one continuous drive and track around the house.

Before: levelled ground with membrane beside concrete wall panels After: finished tamped concrete strip along the wall panels BeforeAfter

Yard strip along a clamp wall

Ground levelled and membrane down, then a tamped strip poured tight to the wall panels.

Before: shuttered apron in front of a steel shed After: finished concrete apron in front of the shed BeforeAfter

Shed apron

Formwork set to the shed doors, poured and finished so machines roll straight in.

Before: compacted stone sub-base inside a walled clamp After: finished power-floated clamp floor BeforeAfter

Covered clamp floor

Stone sub-base compacted between the panels, then poured and power floated under the new roof.

Got a job in mind?